Check-out this B Line residence at the FXFOWLE-designed The NOMA in NoMaD which will be releasing several model units this winter (2018). The 24-story building is nearing completion after topping off in August. The model unit renderings shown here represents Unit #20B is currently listed for $3,125,000.
Read MoreCheck-Out The Newly Completed FXFOWLE-Designed Greenwich Lane In The West Village
The West Village's Greenwich Lane mega-development is now complete after replacing the St. Vincent's Hospital with 5 residential buildings and 5 townhouses. Developed by Global Holdings and The Rudin family, the 97% sold Greenwich Lane features 200 residential units and 5 townhouses
Read MoreHudson Yard's 3 Hudson Boulevard Loses Supertall Designation in Height Reduction, Breaks Ground
Hudson Yards' 3 Hudson Boulevard has broken ground today (November 3, 2017) after the planned tower lost its future supertall designation. A recent height reduction brought the future office tower's height to 940' and 53 floors, down from 1,050' and 66 floors.
Read MoreNew FXFowle-Designed Office Tower, One Willoughby Square, Coming to Downtown Brooklyn
Permits have been filed for One Willoughby Square, a new office tower designed by FXFowle at 420 Albee Square in Downtown Brooklyn. The project was originally supposed to be the tallest residential tower in Brooklyn but has since gone through a series of alterations to now rise an expected 36 floors and 495', covering 385,460 SF of total development.
Read MoreConstruction Update: The NOMA From Alchemy Properties Tops Off in NoMaD
The NOMA, NoMaD's new condo development from Alchemy Properties, has officially topped off. Designed by FXFOWLE Architects, the 24-story building draws inspiration from the Bauhaus movement. The NOMA features 55 residences which range in size from 1-bedrooms from $1.55 million, 2-bedrooms from $ 2.6 million to 3-bedroom penthouses from $6.75 million. Amenities include a Landscaped Terrace, Library/Lounge, Fitness Center, Bicycle Storage, Generator, and a 24-hour attended lobby. Completion is expected by December 2017.